M O D H A U S +
MODULAR
​
​
Built Right . Built for Life
Advanced . Modern
Sustainable . Modular
Built Right . Built for Life
LATEST STYLES & IDEAS
ModHaus+ Steel Shipping Container Homes & Modules
POOL HOUSE
1 Bedroom open concept pool house
MODERN TWO STORY
Two story custom design
HIGH VIEW CONDO
2 Bedroom Dual Cross Racked Design
​
MODERN SUSTAINABLE
Advanced simplistic sustainable
OFFICE STUDIO
Open concept home
Gym, Office, Spa, Guest House
GLASS BOX DESIGN
Beautiful open glass cottage
Container Garages
Secure Storage
ModHaus+ Shipping Container Garages
20ft GARAGE
20x16ft GARAGE
40x40ft GARAGE
PoolHaus+ Shipping Container Pools
40ft POOL
40ft POOL / HOT-TUB
20ft POOL
BarHaus+ Custom Bars
HALF-PINT BAR
FACE OFF BAR
SHOW-TIME BAR
DREAM . DESIGN . BUILD . DELIVER
CONSULTATION
Phone Consultation with TEAM
Site Visit by ModHaus
Review building location
Zoning Verification
Upgrade Option Pricing
Budgetary Estimate
Design proposal to move Forward
Cost is quoted per project
DELIVERY & INSTALLATION
Once we receive confirmation that your site is ready to receive your ModHaus+ home or unit we will require a 100 percent payment down on all shipping and craning costs 15days prior to the shipping date.
The ModHaus+ Team will arrange with the shipping and crane operators to install your Home or unit on it foundation or grounds.
After the installation and utility hook ups are completed and we do a walk through we then give you the Keys.
DESIGN & ENGINEERING
Structural Foundation design
Energy calculations
Civil Engineering
Septic design
Soil report
Site plan, floorplans, elevations, sections, and initial foundation design.
First draft of architectural set of drawings. Some jurisdictions allow this as a Development Permit (planning) approval set
3D visual of your home where you can make revisions or approve and move onto the drawings
DECKS. RAILS. STAIRS.
Any decks stairs or railings etc would be completed by your own contractor or one recommended by the ModHaus Team
PAYMENT STRUCTURES
We Require a 40% deposit 60days prior to the production date
Once your unit reaches key stages and completion of the steel structure and prior to electrician ,plumbing, drywall
paint and interior etc. we Require another 30% down payment
Upon completion of your project in the ModHaus factory the final 30% of the unit is due
10% is held back for 45 days after completion and or when a final walk threw and sign off is completed and any deficiencies are corrected
MOVE IN & ENJOY
When Dreams finally become realities and everything becomes worth it !!
WOOD BURNING ELECTRIC GENERATING BOILERS
GAS/DIESEL GENERATORS
SOLAR PANELS
HIGH OUTPUT SOLAR PANELS
BATTERY STORAGE SYSTEMS
AUTOMATION CONTROLS
WHAT OUR CLIENTS THINK
" we bought a new pool for our town home,and we were exstreamly pleased with the service and quality we received from this company
Mike & Jane
Bracebridge ,ON
'' Me and my wife finally got our new home from ModHaus we are very very happy so far
Mark Wilson
Brantford,ON
I bought a back yard office to work from home ,and my wife got the spa sauna,hot tub combo as well we highly recommend ModHaus+
Tyler B
Ottawa,ON